Inventory Control Dashboard: EOQ, Kanban, and Safety Stock
This project showcases a comprehensive inventory control dashboard built in Google Sheets, applying key supply chain management techniques. It features dynamic calculators for Economic Order Quantity (EOQ), Safety Stock, and Kanban Replenishment to support better inventory planning and cost efficiency. The models help visualize trade-offs between ordering frequency, holding costs, and stockout risks, using real-world data and formula-driven logic. This dashboard demonstrates my ability to translate operations theory into practical tools for business decision-making.
📦 Economic Order Quantity (EOQ) – Google Sheets Calculator
Part 1 of my Inventory Control Dashboard Project
📌 Purpose of the EOQ:
The Economic Order Quantity (EOQ) helps businesses decide how much inventory to order at a time, in a way that minimizes total costs. Those costs include:
The cost of placing orders
The cost of storing and holding inventory
🛠️ How I Did It – Step by Step (Explained Simply):
Step 1: Set Up the Problem
I used a real-world example with these inputs:
Annual product demand = 5,000 units
Product value = $100 per unit
Order cost = $100 per order
Inventory holding cost = 25% of item value per year
These numbers reflect what it costs a company to buy, order, and store inventory.
Step 2: Test Different Order Sizes
In the spreadsheet, I tested different order quantities:50, 100, 150, 200, 250, 300, 350, 400 units per order.
For each one, I calculated:
✅ A) Order Receiving Cost
Formula: Demand/ Order Quantity x Order Cost
Example (for Q = 50): 5000/50 x 100 = 10,000


Meaning: If you order fewer units at a time, you need to place more orders, which increases costs.
✅ B) Inventory Holding Cost
Formula: Order Quantity/ 2 x Product Value x Holding Cost %
Example (for Q = 50): 50/2 x 100 x 0.25 = 625

Meaning: Larger orders mean more stock sitting in storage, which costs money to maintain.
✅ C) Total Cost
Formula:
Order Receiving Cost + Inventory Holding Cost
For Q = 50:
10,000+625=10,625


Drag over values to see the total Cost at each Order quantity and it'll look like this below:

Step 3: Analyze Results
I used a graph to show:
Total cost drops as order size increases (at first),
Then rises again as holding costs begin to outweigh the savings.
The lowest total cost occurred at an order size of 200 units.

Step 4: Use the EOQ Formula to Confirm
I used the EOQ formula to mathematically find the best order quantity:
EOQ=

Where:
D = Demand
O = Order cost
C = Holding %
V = Item value
Result: EOQ = 200 units — confirming what I saw in the spreadsheet graph.


💡 Why This Matters (What Recruiters Should Know):
This project shows that I:
Understand cost-efficient inventory management
Can apply formulas and logic to real-world business problems
Know how to use Google Sheets (or Excel) for automation, testing, and decision-making
Can visualize trade-offs (ordering too much vs. too little)
Help businesses save money by avoiding over-ordering or over-stocking
Summary:
I built an interactive inventory model using Google Sheets to calculate the Economic Order Quantity (EOQ), a classic supply chain formula used to minimize total inventory costs. I tested various order sizes, calculated costs step by step, and confirmed my results both visually (in a chart) and mathematically. This demonstrated my skills in supply chain optimization, data-driven decision making, and spreadsheet modeling.
Safety Stock Calculation Using Demand and Lead Time Variability (Google Sheets)
Part 2 of my Inventory Control Dashboard Project
📌 Purpose of Safety Stock:
Safety Stock is extra inventory a business keeps on hand to protect against uncertainties such as fluctuations in customer demand or delays in receiving new stock. It helps prevent stockouts (running out of items) so customers stay satisfied and sales don’t get lost.
📊 What I Did
I used historical data on daily demand and order lead times (how long orders take to arrive) to calculate how much safety stock to keep — balancing the risk of stockouts against the cost of holding too much inventory.
How I Calculated Safety Stock – Step by Step
🛠️ Step 1: Collect Data
I collected 30 days of demand data (how many units customers ordered daily).
I also tracked 6 recent order lead times (how many days it took for those orders to arrive).

🧮 Step 2: Calculate Basic Statistics
I calculated four key values from this data:
Average Demand — the typical number of units customers buy per day.
Standard Deviation of Demand — how much daily demand varies.
Average Lead Time — the typical number of days for orders to arrive.
Standard Deviation of Lead Time — how much lead times vary.
These statistics give insight into variability — which drives how much safety stock is needed.



⚙️ Step 3: Calculate Combined Standard Deviation
Demand and lead time both vary, so I combined their effects using this formula:

In simple terms, this tells us the overall uncertainty in demand during the lead time period, considering both fluctuating demand and delivery times.

🎯 Step 4: Choose a Service Level
The service level is the probability you want to avoid stockouts — for example, 95% means you want to be in stock 95% of the time. This reflects how much risk of running out you are willing to accept.
I converted the service level to a value called k, which tells us how many standard deviations to cover for that probability. For 95%, this is approximately 1.64.

🔢 Step 5: Calculate Safety Stock
Finally, I multiplied the combined standard deviation by k:
Safety Stock = k x Combined Std Dev
This gives the number of units to keep as buffer inventory to meet the chosen service level.


📈 Results & Insights
For my data, the safety stock came out to 40 units for a 95% service level.
I also analyzed how different service levels (from 90% to 99.9%) affect the amount of safety stock needed.

Higher service levels require more stock — which reduces risk but increases costs.
This trade-off helps management decide the optimal balance between customer satisfaction and inventory expense.
Why This Project Matters
By calculating safety stock using actual demand and lead time variability, I demonstrated the ability to:
Use statistical analysis to solve practical supply chain problems
Make data-driven decisions that reduce stockouts and avoid excess inventory
Apply spreadsheet skills (Google Sheets) to automate complex calculations
Help businesses balance customer service goals with cost efficiency
Summary
I built a safety stock calculator in Google Sheets using real historical demand and lead time data. By calculating averages, standard deviations, and combining variability, I determined the optimal inventory buffer to maintain a desired service level. This project shows my ability to apply statistical methods and spreadsheet modeling to improve inventory management and support operational excellence.
📦 Kanban Bin Size Calculation – Google Sheets
Part 3 of my Inventory Control Dashboard Project
✅ What is a Kanban System?
In lean manufacturing or inventory control, a Kanban system helps regulate stock levels by using visual cues (often physical bins) to signal when to restock.
I focused on a 3-bin Kanban system:
Bin 1 is used on the production floor.
Bin 2 stays in storage, ready to replace Bin 1.
Bin 3 sits with the supplier, ready to ship — it must be fully stocked and ready, with no delays or production time added.
The key to this system running smoothly? Knowing how many units each bin should hold. That’s what I calculated.
📊 What I Did
I used historical demand and order lead time data to calculate how many units should go in each Kanban bin. This ensures the system never runs out of stock — and doesn’t overstock either.
🛠️ Step 1: Gather the Data
Here’s a simplified version of what I used:
The Demand column shows how many units were needed each day.
The Order Lead Time column shows how long past orders took to arrive.

🧮 Step 2: Calculate Averages
I used built-in spreadsheet formulas to calculate:
Average Demand — how many units are typically needed per day.
Average Lead Time — how long it typically takes for an order to arrive.

For example:
📦 Average Demand ≈ 19.83 units
⏱ Average Lead Time ≈ 5.67 days
These give us a baseline for how much product is typically consumed while waiting for new stock to arrive.
🔢 Step 3: Calculate Lead-Time Demand (Kanban Bin Size)
This is the key step. I multiplied average daily demand by average lead time:
Lead - Time Demand = Avg. Demand x Avg. Lead Time


That gives us the minimum bin size needed to meet demand while waiting on the next order.
📐 Result:19.83 units/day × 5.67 days ≈ 112 units per bin
So, in this setup, each bin should contain 112 units to ensure continuous operation without delays.
💡 Why This Matters
This project shows how just a few data points can help:
Streamline inventory
Avoid shortages
Prevent overstocking
Improve supply chain flow
The Kanban method is popular in lean manufacturing and just-in-time inventory systems, and this project proves I can apply it using spreadsheet tools to drive data-based inventory decisions.
Summary
I built a Kanban bin size calculator using Google Sheets, based on historical demand and lead time data. By calculating average daily demand and average lead time, I determined the ideal bin size for a 3-bin Kanban system. This project demonstrates my ability to apply lean inventory concepts, perform data analysis in spreadsheets, and support efficient, cost-saving inventory operations.
These three projects — Economic Order Quantity (EOQ), Safety Stock Calculation, and Kanban Bin Sizing — demonstrate how I use data and spreadsheet modeling to solve real inventory management problems.
From minimizing total cost through EOQ, to preparing for demand variability with Safety Stock, and streamlining replenishment with Kanban — each model highlights essential skills in data analysis, supply chain logic, and operational efficiency.